- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Conerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- SFU Owner's Technical Requirements
- Services
- Building Renovations, Renewals or Modernizations
- Building Signage Requests
- Confidential Shredding
- Custodial Services
- Event Setup
- Filming on Campus
- Furniture & Equipment Removal
- HVAC and Room Occupancy Schedule Changes
- Mail & Parcel Services
- Maintenance Requests
- Minor Building Alterations & Equipment Installations
- Moving Services
- Office Supplies
- Recycling Services
- Snow and Ice Removal Services
- Space Inventory Management
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Renovated Diamond Alumni Centre now open for bookings
- SFU unveils plans for new student housing and child care centre
- SFU School of Medicine moves forward
- Adjustments to cleaning services – What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at SFU
- Engineer Breaks Down Gender Barriers and SFU's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important SFU Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Surrey Campus
Podium 2 (2012) - Achieved LEED CI Silver
New expansion project has added another 46,500 square feet of space in Surrey campus inlcuding new classrooms, teaching and wet labs, and research labs for first and second year science programs. SFU occupies levels two and three of the Podium, along with the balance of the campus - three suspended levels, called gallerias, which hang dramatically over the mall. Main green achievements of this project are:
- 30% reduction of potable water use from the baseline buildings
- Use of recycled lab furniture
- Re-use of the existing raised floor system, including in wet labs
- Increase indoor air quality by controlling of temperture, ventelation and thermal comfort systems
Click here for more information
Click here to review the LEED Scorecard