- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Conerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- SFU Owner's Technical Requirements
- Services
- Building Renovations, Renewals or Modernizations
- Building Signage Requests
- Confidential Shredding
- Custodial Services
- Event Setup
- Filming on Campus
- Furniture & Equipment Removal
- HVAC and Room Occupancy Schedule Changes
- Mail & Parcel Services
- Maintenance Requests
- Minor Building Alterations & Equipment Installations
- Moving Services
- Office Supplies
- Recycling Services
- Snow and Ice Removal Services
- Space Inventory Management
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Renovated Diamond Alumni Centre now open for bookings
- SFU unveils plans for new student housing and child care centre
- SFU School of Medicine moves forward
- Adjustments to cleaning services – What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at SFU
- Engineer Breaks Down Gender Barriers and SFU's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important SFU Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
SFU Owner's Technical Requirements
Technical Requirements for Prime Consultants, Architects, Consulting Engineers and Construction Professionals
The SFU Owner’s Technical Requirements (OTR) are documented principles of designs and construction for working at SFU Burnaby Campus and provides a set of requirements organized in Master Format for Construction Professionals. The technical requirements are not intended to be prescriptive or hinder design creativity, but serves as a starting point to expedite SFU project delivery. The OTR is also not a design manual but does outline SFU's performance objectives, recommended practices that have worked at SFU, sample front end documents plus steps to follow to navigate through a project at SFU.
The service provider working with the OTR is expected to complete the following during the design process:
· Download and read through the document pertaining to your approach
· Follow the OTR as provided or create alternative design approach
· Provide and communicate an exception report broken down by sections on any alternative designs, substitutions and/or technical advancement or obsolescence.
Disclaimer
The SFU OTR is not a substitute for professional services commissioned by the University. Compliance to best practices, professional liability, standard of care, latest Standards, Acts, Bylaws and Building and Energy Codes shall prevail and supersede the OTR. The consultant must bring these conflicts in writing to the attention of the Project Manager, SFU Facilities Services as a variance request to the OTR.
For general inquiries, please contact the OTR Committee at sfu_otr@sfu.ca
Specification Division Documents
- Division 00 Procurement and Contracting Requirements
- Division 01 General Requirements
- Division 02 Existing Conditions
- Division 03 Concrete
- Division 04 Masonry
- Division 05 Metals
- Division 06 Wood, Plastics, and Composites
- Division 07 Thermal and Moisture Protection
- Division 08 Openings
- Division 09 Finishes
- Division 10 Specialties
- Division 11 Equipment
- Division 12 Furnishings
- Division 14 Conveying Equipment
- Division 20 Mechanical - General Requirements
- Division 21 Fire Suppression
- Division 22 Plumbing
- Division 23 Heating, Ventilating, and Air Conditioning (HVAC)
- Division 25 Building Management Systems
- Division 26 Electrical
- Division 27 Communications
- Division 27A Audiovisual
- Division 28 Electronic Safety and Security
- Division 31 Earthwork
- Division 32 Exterior Improvements
- Division 33 Utilities
- Section 01 00 00 General Requirements
- Section 01 11 00 Summary of Work (TEMPLATE)
- Section 01 14 00 Work Restrictions
- Section 01 26 00 Contract Modification Procedures
- Section 01 29 00 Payment Procedures
- Section 01 31 00 Project Mgmt Coordination
- Section 01 32 16 Construction Progress Schedule (TEMPLATE)
- Section 01 33 00 Submittal Procedures
- Section 01 35 16 Alteration Project Procedures
- Section 01 35 29 HSE Response Procedures
- Section 01 35 43.13 Environmental Procedures Haz Mat
- Section 01 35 43 Environmental Procedures
- Section 01 41 00 Regulatory Requirements
- Section 01 45 00 Quality Control (TEMPLATE)
- Section 01 51 00 Temporary Facilities Controls
- Section 01 60 00 Ergonomics Requirements
- Section 01 74 19 Construction Waste Mgmt Disposal
- Section 01 77 00.1 Project Closeout Checklist
- Section 01 77 00 Closeout Procedures (TEMPLATE)
- Section 01 78 23 Operation and Maintenance Data
- Section 01 78 36 Warranties
- Section 01 78 39.1 Record Data Submission Checklist
- Section_01_78_39.2 Records Request Checklist
- Section 01 78 39 Project Record Docs
- Section 01 78 45 Spare Parts and Maintenance Materials
- Section 01 91 00 Commissioning (TEMPLATE)
- Section 07 00 10 Building Envelope General Req
- Section 07 10 00 Dampproofing and Waterproofing
- Section 07 21 00 Thermal Insulation
- Section 07 25 00 Weather Barriers
- Section 07 40 00 Cladding
- Section 07 50 00 Membrane Roofing
- Section 07 55 63 Vegetated Protected Roofing
- Section 07 61 00 Sheet Metal Roofing
- Section 07 62 00 Sheet Metal Flashing and Trim
- Section 07 72 00 Roof Accesories
- Section 07 84 00 Firestopping
- Section 07 92 00 Joint Sealants
- Section 09 00 10 Finishes-General Requirements
- Section 09 21 16 Gypsum Board Assemblies
- Section 09 22 16 Non-Structural Metal Framing
- Section 09 30 00 Tiling
- Section 09 51 00 Acoustical Ceilings
- Section 09 64 00 Wood Flooring
- Section 09 65 00 Resilient Flooring
- Section 09 67 00 Fluid Applied Flooring
- Section 09 68 00 Carpet
- Section 09 69 00 Access Floor
- Section 09 90 00 Painting and Coating
- Section 10 00 10 Special Room Requirements
- Section 10 14 00 Room Numbering
- Section 10 14 01 Sign Standards and Guidelines
- Section 10 14 01.1 SFU Interior Wayfinding and Signage Standard
- Section 10 14 01.2 SFU Exterior Wayfinding and Signage Standard
- Section_10_14_01.3_SFU Smoking Area Sign Standard
- Section 10 20 00 Interior Specialties
- Section 10 21 13 Toilet Compartments
- Section 10 28 00 Toilet Bath Laundry Accessories
- Section 10 44 00 Fire Protection Specialties
- Section 20 00 05 Mechanical General Requirements
- Section 20 00 06 Meters
- Section 20 00 07 Salvage of Existing Equipment
- Section 20 00 08.1 Pipe Colour Code Standards
- Section 20 00 08.2-2019 SFU Identification and Labeling Standards
- Section 20 00 08 Mechanical Identification
- Section 20 00 30 Indoor Thermal Environment
- Section 20 05 01 Design Development Documents
- Section 21 05 00 Fire Protection General Requirements
- Section 21 12 00 Fire Suppression Standpipes
- Section 21 13 13 Sprinkler Systems
- Section 21 21 00 Carbon Dioxide Fire Extinguishing Sys
- Section 21 22 00 Total Flooding Discharge Sys
- Section 21 23 00 Wet Chemical FES
- Section 21 24 00 Dry Chemical FES
- Section 21 30 00 Fire Pumps
- Section 22 05 00 Plumbing Gerneral Requirements
- Section 22 05 00.1 Plumbing Potable Water Procedures
- Section 22 05 00.2 Plumbing Potable Water Testing Analysis
- Section 22 10 00 Plumbing Piping
- Section 22 11 18 Backflow Cross Connection Control
- Section 22 11 23 Plumbing Pumps
- Section 22 12 05 Tanks
- Section 22 14 26.13 Roof Drains
- Section 22 33 00 Domestic Water Heaters
- Section 22 35 00 Heat Transfer
- Section 22 40 00 Plumbing Fixtures
- Section 22 60 00 Specialty Piping Systems
- Section 23 01 30.51 HVAC Air Dist Sys Cleaning
- Section 23 05 00 HVAC General Requirements
- Section 23 07 19 Thermal Insulation for Piping
- Section 23 20 00 Piping and Pipe Fittings
- Section 23 23 00 Refrigerant Piping
- Section 23 25 00 HVAC Water Treatment
- Section 23 30 00 HVAC Air Distribution
- Section 23 30 10 Air Handling Units
- Section 23 36 00 Air Terminal Units
- Section 23 38 16 Fume Hood Exhaust Systems
- Section 23 60 00 Refrigeration
- Section 26 05 00 Electrical General Requirements
- Section 26 05 01 Design Development Documents
- Section 26 05 02 Installation Methods and Requirements
- Section 26 05 03 Primary Power Systems
- Section 26 05 04 Protective Device Coord and Arc Flash
- Section 26 05 05 High Voltage Cables
- Section 26 05 06 Standard Drawings (In progress)
- Section 26 05 13 Wire and Cables(0-1000V)
- Section 26 05 26 Grounding and Bonding
- Section 26 05 48 Vibration Seismic Controls
- Section 26 05 53 Labeling
- Section 26 10 00 Secondary Power Distribution
- Section 26 11 13 Primary Unit Substation
- Section 26 12 00 Medium Voltage Transformers
- Section 26 27 13 Metering
- Section 26 30 00 Emergency and Standby Power
- Section 26 51 00 Interior Building Lighting
- Section 26 56 00 Exterior Lighting
- Section 27 00 01 Communications Summary
- Section 27 05 00 Common Work Results
- Section 27 06 00 Installation Details
- Section 27 10 00 Structured Cabling Overview
- Section 27 11 00 Telecommunications Room Fittings
- Section 27 13 00 Communications Backbone Cabling
- Section 27 15 00 Communications Horizontal Cabling
- Section 27 16 00 Communications Connecting Devices
- Section 33 00 10.1 SFU MMCD Infrastructure Data Standards
- Section 33 00 10 Underground Utilities Services
- Section 33 10 00 Water Utilities
- Section 33 30 00 Sanitary Sewerage Utilities
- Section 33 49 00 Storm Drainage
- Section 33 51 00 Natural Gas Distribution
- Section 33 61 00 District Heating System
- Section 33 71 00 Electrical Utility Transmission Distrib
- Section 33 71 19 Electrical Underground Duct and Manholes
- Section 33 82 01 CCTV Pipeline Inspection