Large-scale Flexible Assembly Optimization (General Motors Company) This project aims at searching for the optimal assembly process including positions for locators and clamps for best auto body assembly quality. The assembly quality analysis is a complex high-dimensional, expensive, black-box (HEB) problem. Our in-house developed optimization tools can efficiently identify the optimum for problems of 30-100 variables.
Optimal Design of Valtra Display (Vansco Electronics Ltd.) Developed a Design for Production (DFP) methodology and applied it to the instrument panel display for agricultural vehicles.
Rapid Prototyping (Monarch Industries) Re-designed the mould making process by integrating Rapid Prototyping in the current tool making process.