Spatial Analysis
 

I followed the steps on the Cartographic model to get my end results. Below you will see some of the created maps.

Pictures created for the final analysis:
1. Landuse
2. Number of Employed using Public Transit
3. Number of Employed driving by Themselves
4. Average Dwelling Value ($)
5. Average Household Income ($)

Results:
1. Costsurface (origin: Richmond Center)
2. Skytrain Line via Arbutus Street
3. Skytrain Line via Granville Street
4. Skytrain Line via Cambie Street Winner!!!

                                                                                             Content

                             

                                                                                      Top of Page

                             

                                                                                       Top of Page

                             

                                                                                    Top of Page

                             

                                                                                       Top of Page

                             

                                                                                          Top of Page

                             

                                                                                             Top of Page

                             
 

This image shows the possibility of a new Skytrain line through the Arbutus Corridor.
The maximum costs are 184 units.
The route is the most expensive one regarding the criterias I have chosen.

                                                                      Top of Page

                            
 

This image shows the possibility of a new Skytrain line through the Granville Corridor.
The maximum costs are 174 units.
The route has medium costs regarding the criterias I have chosen.

                                                                       Top of Page

                           
 

This image shows the possibility of a new Skytrain line through the Cambie Corridor.
The maximum costs are 168 units.
The route is thus the cheapest possibility.
Regarding the criterias I have chosen this route would be most likely to be built.