PROC
CALENDAR can produce two kinds of calendars: schedule and summary.
Use a ... |
if you want to ... |
and can accept this restriction |
schedule calendar |
schedule activities around holidays and nonwork periods |
cannot calculate sums and means |
|
schedule activities that last more than one day |
|
summary calendar |
calculate sums and means |
activities can last only one day |
Note: PROC CALENDAR produces a summary calendar if you
do not use a DUR or FIN statement in the PROC step.
A
report in calendar format that shows when activities and holidays start and
end.
You must supply a START statement and either a DUR or FIN statement.
Use this statement . . . |
to specify a variable whose value indicates the . . . |
START |
starting date of an activity |
DUR* |
duration of an activity |
FIN* |
ending date of an activity |
*Choose one of these. If you do not use a DUR or FIN statement CALENDAR
assumes you want to create a summary calendar report. |
See Simple Schedule Calendar -- 7-Day Default Calendar ,
Advanced Schedule Calendar ,
as well as Schedule Calendar with Holidays -- 5-Day Default , Schedule Calendar Containing Multiple Calendars ,
Multiple Schedule Calendars with Atypical Workshifts (Separated Output) , Multiple Schedule Calendars with Atypical Workshifts (Combined and Mixed Output) ,
Schedule Calendar, Blank or with Holidays ,
and Calculating a Schedule Based on Completion of Predecessor Tasks
A
report in calendar format that displays activities and holidays that last
only one day and that can provide summary information in the form of sums
and means.
You must supply a START statement. This statement identifies the variable
in the activities data set that contains an activity's starting date.
A summary calendar report can display only one activity on a given date.
If more than one activity has the same START value, therefore, only the last
observation that was read is used. In such situations, you may find PROC
SUMMARY useful in collapsing your data set to contain one activity per starting
date.
See Simple Summary Calendar ,
Summary Calendar with MEAN Values By Observation ,
and Multiple Summary Calendars with Atypical Workshifts (Separated Output)
PROC CALENDAR provides two default calendars for simple
applications.
You can produce calendars without having to specify detailed workshifts and
weekly work patterns if your application can use one of two simple work patterns.
Consider using a default calendar if
- your application uses a 5-day work week with 8-hour days or a
7-day work week with 24-hour days. See Default Calendar Settings and Examples .
- you want
to print all activities on the same calendar.
- you do not need to identify separate calendars.
If you want to produce a specialized calendar, but do not provide all
the necessary information, PROC CALENDAR attempts to produce a default calendar.
These errors cause PROC CALENDAR to produce a calendar with default features:
- If the activities data set does not contain a CALID variable,
then PROC CALENDAR produces a default calendar.
- If both the holidays and calendar data sets do not
contain a CALID variable, then PROC CALENDAR produces a default calendar even if the activities data set contains a CALID variable.
- If the activities and
calendar data sets contain the CALID variable,
but the holidays data set does not, then the default holidays are used.
See the 7-day default calendar in Simple Schedule Calendar and
the 5-day default
calendar in Schedule Calendar with Holidays -- 5-Day Default
- calendar
- a logical entity that represents a weekly work pattern,
which consists of weekly work schedules and daily shifts. PROC CALENDAR contains
two default work patterns: 5-day week with an 8-hour day or a 7-day week with
a 24-hour day. You can also define your own work patterns using CALENDAR
and WORKDAYS data sets.
- calendar
report
- a report in calendar format that displays activities, holidays,
and nonwork periods. A calendar report can contain multiple calendars in one
of three formats
- separate
- Each identified calendar prints on separate output pages.
- combined
- All identified calendars print on the same output pages
and each is identified.
- mixed
- All identified calendars print on the same output pages
but are not identified as belonging to separate calendars.
- multiple calendar
- a logical entity that represents multiple weekly work patterns.
Create a multiple calendar if you want
to print a calendar report
that shows activities that follow different work schedules or different weekly
work patterns. For example, a construction project report might need to use
different work schedules and weekly work patterns for work crews on different
parts of the project.
Another use for multiple calendars is to identify activities so that
you can choose to print them in the same calendar report. For example, if
you identify activities as belonging to separate departments within a division,
you can choose to print a calendar report that shows all departmental activities
on the same calendar.
And finally, using multiple calendars, you can produce separate calendar
reports for each calendar in a single step. For example, if activities are
identified by department, you can produce a calendar report that prints the
activities of each department on separate pages.
Because PROC CALENDAR can process only one data set of each type (activities,
holidays, calendar, workdays) in a single PROC step, you must be able to identify
for PROC CALENDAR which calendar an activity, holiday, or weekly work pattern
belongs to. Use the CALID statement to specify the variable whose values identify
the appropriate calendar. This variable can be numeric or character.
You can use the special variable name _CAL_ or you can use another variable
name. PROC CALENDAR automatically looks for a variable named _CAL_ in the
holiday and calendar data sets, even when the activities data set uses a variable
with another name as the CALID variable. Therefore, if you use the name _CAL_,
at least in your holiday and calendar data sets, you can more easily reuse
these data sets for different calendar applications.
When using a holidays
or calendar data set with multiple calendars, PROC CALENDAR treats the variable
values in the following way:
- Every value of the CALID variable that appears in either the holidays
or calendar data sets defines a calendar.
- If a CALID value appears in the HOLIDATA= data set but not in
the CALEDATA= data set, the work schedule of the default calendar is used.
- If a CALID value appears in the CALEDATA= data set but not in
the HOLIDATA= data set, the holidays of the default calendar are used.
- If a CALID value does not appear in either the HOLIDATA= or CALEDATA=
data set, the work schedule and holidays of the default calendar are used.
- If the CALID variable is not found in the holiday or calendar
data sets, PROC CALENDAR looks for the default variable _CAL_ instead. If
neither the CALID variable nor a _CAL_ variable appears in a data set, the
observations in that data set are applied to a default calendar.
Because you can associate different observations with different calendars,
you can print a calendar report that shows activities that follow different
work schedules or different work shifts or that contain different holidays.
You can
- print separate calendars on the same page and identify each one.
- print separate calendars on the same page without identifying
them.
- print separate pages for each identified calendar.
As an example, consider a calendar that shows the activities of all
departments within a division. Each department can have its own calendar identification
value and, if necessary, can have individual weekly work patterns, daily work
shifts, and holidays.
If you place activities associated with different calendars in the same
activities data sets, you use PROC CALENDAR to
produce calendar reports that print
- the schedule and events for each department on a separate pages
(separate output)
- the schedule and events for the entire division, each identified
by department (combined output)
- the schedule and events for the entire division, but not identified by department (mixed
output).
The multiple-calendar feature was added specifically to enable PROC
CALENDAR to process the output of PROC CPM in SAS/OR software, a project management
tool. See Calculating a Schedule Based on Completion of Predecessor Tasks .
To
identify multiple
calendars, you must use the CALID statement to specify the variable whose
values identify which calendar an event belongs with. This variable can be
numeric or character.
You can use the special variable name _CAL_ or you can use another variable
name. PROC CALENDAR automatically looks for a variable named _CAL_ in the
holiday and calendar data sets, even when the activities data set uses a variable
with another name as the CALID variable. Therefore, if you use the name
_CAL_, at least in your holiday and calendar data sets, you can more easily
reuse these data sets for different calendar applications.
When you use a
holidays or calendar data set with multiple calendars, PROC CALENDAR treats
the variable values in the following way:
- Every value of the CALID variable that appears in either the holidays
or calendar data sets defines a calendar.
- If a CALID value appears in the HOLIDATA= data set but not in
the CALEDATA= data set, the work schedule of the default calendar is used.
- If a CALID value appears in the CALEDATA= data set but not in
the HOLIDATA= data set, the holidays of the default calendar are used.
- If a CALID value does not appear in either the HOLIDATA= or CALEDATA=
data set, the work schedule and holidays of the default calendar are used.
- If the CALID variable is not found in the holiday or calendar
data sets, PROC CALENDAR looks for the default variable _CAL_ instead. If
neither the CALID variable nor a _CAL_ variable appear in a data set, the
observations in that data set are applied to a default calendar.
Schedule Calendar Containing Multiple Calendars ,
Multiple Schedule Calendars with Atypical Workshifts (Separated Output) , Multiple Schedule Calendars with Atypical Workshifts (Combined and Mixed Output) ,
and Multiple Summary Calendars with Atypical Workshifts (Separated Output)
You may need several data sets to produce a calendar,
depending
on the complexity of your application. PROC CALENDAR can process one of each
of four data sets. See Four Possible Input Data Sets for PROC CALENDAR .
Four Possible Input Data Sets for PROC CALENDAR
Data Set |
Description |
Specify with the . . . |
activities |
Each observation contains information about a single activity. |
DATA= option |
holidays |
Each observation contains information about a holiday |
HOLIDATA= option |
calendar |
Each observation defines one weekly work schedule. |
CALEDATA= option |
workdays |
Each variable represents one daily schedule of alternating
work and nonwork periods. |
WORKDATA= option |
The
activities data set, specified with the DATA= option, contains information
about the activities to be scheduled by PROC CALENDAR. Each observation describes
a single activity.
- An activities data set is required. (If you do not specify one
with the DATA= option, PROC CALENDAR uses the _LAST_ data set.)
- Only one activities data set is allowed.
- The activities data set must always be sorted
or indexed by the
START variable.
- If you use a CALID (calendar identifier) variable and want to
produce output that shows multiple calendars on separate pages, the activities
data set must be sorted by or indexed on the CALID variable and then by the
START variable.
- If you use a BY statement, the activities data set must be sorted
by or indexed on the BY variables.
Each observation in the activities data set contains information about
one activity. One variable must contain the starting date. If you are producing
a schedule calendar, another variable must contain either the activity duration
or finishing date. Other variables can contain additional information about
an activity.
If a variable contains an activity's . . . |
Specify it with the . . . |
For this type of calendar. . . |
starting date |
START statement |
Schedule Summary |
duration |
DUR statement |
Schedule |
finishing date |
FIN statement |
Schedule |
A
summary calendar can display only one activity on a given date. If more than
one activity has the same START value, therefore, only the last observation
read is used. In such situations, you may find PROC SUMMARY useful to collapse
your data set to contain one activity per starting date.
Every example in the Examples section uses an activities data set.
You
can use a holidays data set, specified with the HOLIDATA= option, to
- identify holidays on your calendar output
- identify days that are not available
for scheduling work. (In
a schedule calendar, PROC CALENDAR does not schedule activities on these days.)
Each observation in the holidays data set must contain at least the
holiday starting date. A holiday lasts only one day unless a duration or finishing
date is specified. Supplying a holiday name is recommended, though not required.
If you do not specify which variable contains the holiday name, PROC CALENDAR
uses the word DATE
to identify each holiday.
If a variable contains a holiday's . . . |
Then specify it with this statement . . . |
starting date |
HOLISTART |
name |
HOLIVAR |
duration |
HOLIDUR |
finishing date |
HOLIFIN |
You do not need to sort or index the holidays data set.
PROC CALENDAR
calculates time using SAS datetime values. Even
when your data are in DATE. format, the procedure automatically calculates
time in minutes and seconds. If you specify only date values, therefore, PROC
CALENDAR prints messages similar to the following ones to the SAS log:
NOTE: All holidays are assumed to start at the
time/date specified for the holiday variable
and last one DTWRKDAY.
WARNING: The units of calculation are SAS datetime
values while all the holiday variables are
not. All holidays are converted to SAS
datetime values.
If you have many applications that require PROC CALENDAR output, consider
creating a generic holidays data set that contains standard holidays. You
can begin with the generic holidays and add observations that contain holidays
or nonwork events specific to an application.
- CAUTION:
- Do not schedule holidays during nonwork
periods.
Holidays defined in the HOLIDATA= data set cannot occur
during nonwork periods defined in the work schedule. For example, you cannot
schedule Sunday as a vacation day if the work week is defined as Monday through
Friday. When such a conflict occurs, the holiday is rescheduled to
the next available working period following the nonwork day.
Every example in the Examples section uses a holidays data set.
You
can use a calendar data set, specified with the CALEDATA= option,
to specify work schedules for different calendars.
Each observation in the calendar data set defines one weekly work schedule.
The data set created in the DATA step shown below defines weekly work schedules
for two calendars, CALONE and CALTWO.
data cale;
input _sun_ $ _mon_ $ _tue_ $ _wed_ $ _thu_ $ /
_fri_ $ _sat_ $ _cal_ $ d_length time6.;
datalines;
holiday workday workday workday workday
workday holiday calone 8:00
holiday shift1 shift1 shift1 shift1
shift2 holiday caltwo 9:00
;
The variables in this calendar data set consist of
- _SUN_ through _SAT_
- the name of each day of the week that appears in the calendar.
The values of these variables contain the name of workshifts. Valid values
for workshifts are
WORKDAY
(the default workshift)
HOLIDAY
(a nonwork period)
- names of variables in the WORKDATA= data set (in this
example,
SHIFT1
and
SHIFT2
).
- _CAL_
- the CALID (calendar identifier) variable. The values of
this variable identify different calendars. If this variable is not present,
the first observation in this data set defines the work schedule that is applied
to all calendars in the activities data set.
If the CALID variable contains a missing value, the character or numeric
value for the default calendar (
DEFAULT
or 0) is used.
See The Default Calendars for further details.
- D_LENGTH
- the daylength identifier variable. Values of D_LENGTH indicate
the length of the standard workday to be used in calendar calculations. You
can set the workday length either by placing this variable in your calendar
data set or by using the DAYLENGTH= option.
Missing values for this variable default to the number of hours specified
in the DAYLENGTH= option; if the DAYLENGTH= option is not used, the day length
defaults to 24 hours if INTERVAL=DAY, or 8 hours if INTERVAL=WORKDAY.
You
can use a calendar data set with or without a workdays data set. Without
a workdays data set, WORKDAY in the calendar data set is equal to one of
two standard workdays, depending on the setting of the INTERVAL= option:
If INTERVAL= |
Then the work-shift begins at . . . |
And the day length is . . . |
DAY |
00:00 |
24 hours |
WORKDAY |
9:00 |
8 hours |
You can reset the length of the standard workday with the DAYLENGTH=
option or a D_LENGTH variable in the calendar data set. You can define other
work shifts in a workdays data set.
Multiple Schedule Calendars with Atypical Workshifts (Separated Output) ,
Multiple Schedule Calendars with Atypical Workshifts (Combined and Mixed Output) ,
and Summary Calendar with MEAN Values By Observation feature a calendar data set.
You
can use a workdays data set, specified with the WORKDATA= option, to define
the daily workshifts named in a CALEDATA= data set.
You do not need a
workdays data set if your application can use
one of two default work shifts:
If INTERVAL= |
Then the work-shift begins at . . . |
And the day length is. . . |
DAY |
00:00 |
24 hours |
WORKDAY |
9:00 |
8 hours |
See the
INTERVAL= option .
Each variable in the workdays data set contains one daily
schedule of alternating work and nonwork periods. For example, this DATA
step creates a data set that contains specifications for two work shifts:
data work;
input shift1 time6. shift2 time6.;
datalines;
7:00 7:00
12:00 11:00
13:00 .
17:00 .
;
The variable SHIFT1 specifies a 10-hour workday, with one nonwork period
(a lunch hour); the variable SHIFT2 specifies a 4-hour workday with no nonwork
periods.
The
missing values default to 00:00 in the first observation and to 24:00 in all
other observations. Two consecutive values of 24:00 define a zero-length
time period, which is ignored.
See Multiple Schedule Calendars with Atypical Workshifts (Separated Output)
Treatment of Missing Values in PROC CALENDAR summarizes the treatment of missing values for variables in the data sets
used by PROC CALENDAR.
Treatment of Missing Values in PROC CALENDAR
Data set
|
Variable |
Treatment of missing values |
Activities (DATA=) |
CALID |
default calendar value is used |
|
START
|
observation is not used |
|
DUR |
1.0 is used |
|
FIN |
START value + daylength is used |
|
VAR |
if a summary calendar or the MISSING option is specified, the missing
value is used; otherwise, no value is used |
|
SUM, MEAN |
0 |
|
Calendar (CALEDATA=) |
CALID |
default calendar value is used |
|
_SUN_ through _SAT_ |
corresponding shift for default calendar is used |
|
D_LENGTH |
if available, DAYLENGTH= value is used; otherwise, if INTERVAL=DAY,
24:00 is used; otherwise 8:00 is used |
|
SUM, MEAN |
0 |
|
Holiday (HOLIDATA=) |
CALID |
all holidays apply to all calendars |
|
HOLISTART |
observation is not used |
|
HOLIDUR |
if available, HOLIFIN value is used instead of HOLIDUR value; otherwise
1.0 is used |
|
HOLIFIN |
if available, HOLIDUR value is used instead of HOLIFIN value; otherwise,
HOLISTART value + day length is used |
|
HOLIVAR |
no value is used |
|
Workdays (WORKDATA=) |
any |
for the first observation, 00:00 is used; otherwise, 24:00 is used |