![]() Chapter Contents |
![]() Previous |
![]() Next |
The X11 Procedure |
The date variable (or _DATE_ ) values outside the range of the actual data (from ARIMA forecasting, backcasting, or from YRAHEADOUT) are extrapolated, while all other ID variables are missing.
![]() Chapter Contents |
![]() Previous |
![]() Next |
![]() Top |
Copyright © 1999 by SAS Institute Inc., Cary, NC, USA. All rights reserved.