The advantages of
using Boolean Approach Method to predict possible landslide occurrence are:
Although very
effective, since the Boolean Approach Method does not predict medium to low
susceptive area as accurately as it does the high susceptive area, it is
possible that some of the vulnerable potential landslide area can be neglected
without adequate attention. In
order to compromise this, such methods like Weighted Linear Combination is
necessary to predict medium to low susceptive area.
Predicting
susceptive landslide site is the first step of preventing any disaster that
might bring loss and casualties.
In addition to making accurate prediction, it is more important to come
up with solutions to prevent and execute them.
In conclusion, in
order to accurately and reliably predict landslide occurrence area, not only
maps made using Weighted Linear Combination are needed but also maps made using
Boolean Approach. By carefully
analyzing such maps, the municipality of Boun can predict susceptive area and
take actions to prevent landslide.
There were some
difficulties in doing the project.
First of all,
since Boun is such a small municipality, it was extremely difficult to find
extra information about the region other than the data I collected. The information about amount of
rainfall in the region (Chosun newspaper,
Aug1998) was the only relevant information I could find and used.
Secondly, although
I found land use map of the region with great difficulty, I could not utilize
the data due to technical error.
With the data from the land use map, much more accurate assumption and
prediction could have been made for such area like ¡°no tree¡± area.
Thirdly, due to my
relatively little knowledge in the subject of geology and landslide, I believe
it is possible that I have missed many factors that could resulted more
reliable and accurate predictions.
For example, the relationship among landslide and drainage, slope, tree,
and soil could be much more complex and detailed than what I have assumed in
the project, and that could have resulted different prediction.
Fourth, projection
was a problem throughout this project.
All data layers must have been converted to a common reference system,
and it was hard to find the Korean specific reference system.